Pavilion Progress
[Preparing the bed for the slab on the west side of the pavilion.]
Well, I’m off to bed. I’m preparing a 12′ X 16′ X 6” bed for a concrete patio, and I have to tamp down the dirt tomorrow, now that the hole is all dug out. The stone to put in the bed is coming on Saturday, and I hope to order the cement before it gets too cold out.
Â
Tom Hesley